Picture 1: The semi-permeable pavers are being installed this week. These pavers allow rainwater to be filtered back into the ground rather than directly into the street gutter system.

Picture 2: The talented crew prepares the base for the pavers while the landscapers are busy getting the plants organized and in the ground.

Picture 3: A member of the audio/visual team works on the recently installed video projector in the sanctuary. The video screen is in place and it won’t be long before everything gets tested.

Craig Spery is the chair of the sanctuary planning and construction committee