Work continues with electrical and audio/visual items along with preparing the curbing in the rear of the property for the pending asphalt work.
Photo shows the progress in the courtyard area. The drainage of this space must meet strict conditions set by the city permit. It requires that rainfall must be largely contained on the property resulting in the use of semi-permeable pavers so the rainfall can percolate into the soil as opposed to the street gutter. A layer of gravel will be applied on top of this base before the pavers are installed.

Craig Spery is the chair of the sanctuary planning and construction committee