Sanctuary Construction Update – Week #33

Sanctuary Construction Update – Week #33

The two driveway entrances on Mesa Verde Drive should be ready for use this Sunday. The city required that the new concrete cure for at least seven days before use and the contractor has to patch some asphalt areas by this Friday.

Other work continues with many things happening at the same time. Electrical, painting at each building, sound system speakers and wiring being installed, irrigation supply lines being installed, the courtyard is being prepared for paving stones.

Image caption: Jan Szeneri, of Abed's Flooring in Huntington Beach, is singlehandedly installing the oak hardwood on the raised platform in the new sanctuary. It was scheduled to take about a month to complete and he’s almost finished and it looks fantastic already. He’s a very talented craftsman.


Craig Spery is the chair of the sanctuary planning and construction committee