This is a reminder about the closure of the two driveways on Mesa Verde Drive will likely occur between now and April 14. They will need that time to demolish the existing concrete and reconfigure it to today’s acceptable standards. During that time we will use the entrance on Adams Ave to enter and leave the property. Thank you for your cooperation.
Work continues on the new sanctuary. The painting of the doors and trim within the courtyard to match the colors of the new building. The new irrigation system has started to be installed. The new water main shutoff for the sprinkler system is in place and functioning. The main underground conduit for the main electrical supply has been placed and further electrical connections are being made. The raised platform has begun to receive the final layer of solid oak flooring.

Craig Spery is the chair of the sanctuary planning and construction committee