Sanctuary Construction Update – Week #27

Sanctuary Construction Update – Week #27

Lots of activity at the construction site this week - both inside and outside. Interior walls are being prepared for primer and paint while the concrete floor has had the initial polishing. Outside the site work will start to ramp up with the storm water drain lines being placed along with irrigation lines in preparation for the eventual pavers that cover the majority of the area.

Photo: The stucco is complete and the scaffolding has been taken down to allow the exterior site work to begin. The doors and windows have started to be installed and interior work continues.


Craig Spery is the chair of the sanctuary planning and construction committee