The work continues on the new sanctuary. The high tech roof membranes are in place on the main roof and the canopy roof, they come with an unbelievable fifty year warranty. The HVAC (heating, ventilation and air conditioning) system is currently being installed on the main roof with the related ductwork entering the ceiling of the sanctuary. The interior ceiling of the sanctuary is being prepared to be painted black before the suspended ceiling is installed. Preparation for the application of stucco on the exterior walls continues and the stucco will be applied soon.

Craig Spery is the chair of the sanctuary planning and construction committee